The port of Liverpool

// 2025

// Project Requirements:

A bulk liquid shipping facility based at the Port of Liverpool required a comprehensive electrical and control system installation within their boiler house. The works were necessary to support the introduction of a new site-wide heating system, ensuring efficient and safe operation across the entire facility.

// What We Did:

Our team was tasked with designing and delivering the electrical and control infrastructure to power and manage the new heating system. This involved:

  • Installing new electrical distribution to supply the boiler house and associated heating plant equipment.
  • Implementing control wiring and panels to provide full system control and automation across the site.
  • Integrating the new system with existing site infrastructure to ensure seamless operation and minimal disruption to day-to-day activities.
  • Carrying out thorough testing and commissioning to ensure compliance with industry standards and client requirements.

// The Outcome:

The Port of Liverpool site now benefits from a fully functional and automated heating system, supported by a reliable and professionally installed electrical and control setup. Our work has enhanced the site’s operational efficiency and ensured future scalability for ongoing industrial processes. This project demonstrates our capability to deliver complex industrial electrical installations in high-demand environments.